CMT manufacturing · Romania, EU
Sportswear & teamwear, made in the EU.
We cut, sew and finish knitted tops, tracksuits and hoodies for teamwear and athleisure brands — from 100 pieces per style, tracked order by order in our own production system.
- Model
- CMT
- Minimum
- 100 pcs / style
- Lead time
- 4–6 weeks
- Origin
- Romania, EU
- Manufacturing since
- 2007
- Embroidery & DTF
- In-house
- Garments per month
- 5,000–7,000
- Single market — no customs, no duties
- EU
What we make
Knitted sportswear and teamwear, produced CMT with your fabric and trims.
- 01
Training tops & half-zips
Technical jersey, raglan and panelled constructions.
- 02
T-shirts & polos
Crew neck, V-neck and polo collars for team and promotional runs.
- 03
Hoodies & sweatshirts
Cotton/poly fleece, kangaroo pockets, full-zip and pullover.
- 04
Tracksuits & pants
Full tracksuits, tapered and skinny pants, shorts.
- 05
Club & team merchandise
Short runs with logos embroidered or transferred in-house.
- 06
Samples & pilot runs
Samples are invoiced and credited against your first order.
Under one roof
- CuttingStraight-knife cutting from your markers.
- SewingLockstitch, overlock, coverstitch, buttonhole and button lines.
- EmbroideryIn-house computerised embroidery for logos and crests.
- DTF transfersFull-colour heat transfers, applied in-house.
- Finishing & packingPressing, folding, labelling and packing to your PO.
Embroidery & DTF, in-house
Crests, club badges and logos are digitised and embroidered in our own factory — no subcontractor, no extra transport, no waiting between sewing and decoration.
Digitising in-house
Embroidery files prepared and adjusted by our own team, from your artwork.
Detailed multi-colour crests
Fine lettering and small details, consistent across the whole run.
Names, numbers, sponsors
Full-colour DTF heat transfers, applied after sewing.
One flow, one order
Sewn, embroidered and packed in the same building, tracked in the same system.



How we work
Send your tech pack
Styles, size breakdown, trims list, packing spec and target delivery window.
Costing & quote
Operation-based costing. You get a quote within 3–5 working days.
Paid sample
Ready 10–15 working days after materials arrive; the cost is credited on your first order.
Pilot run
100–500 pieces to prove fit, quality and timing before volume.
Production & tracking
Weekly status from our production system: cutting, sewing, packing, dispatch.
The essentials
- Model
- CMT — you supply fabric and trims; we cut, sew and finish.
- Minimum
- From 100 pieces per style.
- Lead time
- 4–6 weeks from materials in-house and sample approval.
- Shipping
- By truck across the EU single market — no customs, no duties.
Why brands work with us
Traceability by default
Every order lives in our own ERP — cut receipt, line progress, packing and dispatch — and you get a weekly status.
Small runs welcome
From 100 pieces per style, with fast repeats — not built for container volumes.
Proven in teamwear
We currently produce for an established teamwear brand supplying schools and sports clubs.
Straight talk on capacity
We plan new partners around our seasonal peak and tell you upfront which slots we can hold.
The factory
Our factory is in Râmnicu Sărat, Buzău county, Romania — close to the E85 European road, with easy truck access.
Our lines are set up for knitted sportswear, with cutting, sewing, embroidery, transfer printing and packing in the same building.
Social compliance audit history with international retailers. Documentation available on request.




For companies in Romania
Embroidered workwear, uniforms and merchandise for Romanian companies — from 50 pieces, with payment in advance. Use the form below or message us on WhatsApp.
Request a quote
Tell us what you need. A link to your tech pack helps us quote faster. We reply within 2 working days.
contact@kalrapro.ro
+40 744 532 040